Field notes on connectivity & power.

Engineering guides, reference material and project lessons from the team that designs, terminates and tests infrastructure for a living — written to be useful before you ever pick up the phone.

Published continuously

Vol. 04 · 2026

For a decade, “more bandwidth” in the data center meant swapping transceivers and leaving the cabling alone. At 400G, that era ends. The fiber plant itself becomes a design decision

Latest articles

4 articles

Designing for 400G: a field guide to high-density fiber in the modern data center.

For a decade, “more bandwidth” in the data center meant swapping transceivers and leaving the cabling alone. At 400G, that

Designing for 400G: a field guide to high-density fiber in the modern data center.

For a decade, “more bandwidth” in the data center meant swapping transceivers and leaving the cabling alone. At 400G, that

Designing for 400G: a field guide to high-density fiber in the modern data center.

For a decade, “more bandwidth” in the data center meant swapping transceivers and leaving the cabling alone. At 400G, that

Have a project the articles don't quite cover?

Skip the back-and-forth. Send us the constraints — density, environment, standards, timing — and an infrastructure engineer replies with a concrete configuration within 24 hours.

24h

Engineering response time

72h

Configured BOM turnaround

EN / ISO / IEC

Certified to the standards you specify

Scroll to Top